Your crew documents every trench section in 3D while it is still open. The prime contractor and the network owner see what you built, where and how deep, so there is nothing left to dispute and nothing holding up your invoice.
Once the trench is closed, it is your word against the drawing. Depth and placement are hard to prove afterwards.
The section is done, but invoicing waits until someone else has mapped it.
Faults found late mean digging again, at your cost.
Progress is reported to the prime contractor by phone, photos in messaging apps and paper notes.
Every section is recorded in 3D to better than 10 cm in x, y and z, with relative depth from ground level. Geotagged photos show cables, pipes, protections and network elements before the trench is closed.
Mappings and photos are available immediately in the Groundhawk Portal. The prime contractor follows your progress in real time, and documentation is ready the day the work ends, so you can invoice straight away.
The scan shows what is mapped and what is still missing before backfill. Potential issues are caught and fixed while the trench is open, not after.
Your own crew does the mapping after a short training. No surveyor to book, no waiting, and the data is delivered in the format the network owner requires.
How Groundhawk fits the project, from the open trench to the network owner's NIS.
An FTTH/X (Fiber to the Home / Fiber to the X) network is a high-speed broadband communication system that uses fiber-optic cables to replace traditional copper wires for all or part of the "last mile" connection to end users.
Fiber construction covers three broad situations that share the same documentation problem: backbone routes between cities, exchanges, data centres, and mobile sites; fiber-to-the-home rollouts made up of large numbers of short connections; and dedicated business or industrial connections to offices, factories, hospitals, campuses, and data centres.
The physical network is largely the same in all three. It includes fiber cables, main ducts and sub-ducts, chambers, handholes, cabinets, splice locations, road crossings, building-entry points, façade sections, indoor terminations, and connection points to other networks.
A single project commonly combines several installation methods. Open trenching may be used along one section, plowing along a rural roadside, horizontal directional drilling beneath a road, impact moling beneath a driveway, and existing ducts within an urban area.
Work is usually divided between several contractors and crews operating at the same time, across long rural distances on backbone projects, across hundreds or thousands of addresses on access projects, and inside controlled private sites on business connections. The final record must still form one continuous and coherent dataset.
Deviations from plan are normal. Routes change because of landscaping, underground obstacles, property-owner requirements, existing ducts, dense industrial infrastructure, or a different building-entry point than the one designed.
The main documentation challenge is therefore consistency: recording the actual installed route and every significant asset the same way across long distances, high connection volumes, and changing construction conditions.
Common questions about getting your crew started with Groundhawk.
Cabinets, customer drop-offs and customer end points. Marker balls, connection points and any other point of interest. 3D position and photo evidence recorded together at the point.
No separate surveying visit to schedule, wait for or pay for. The mapping cost comes out of the work that is already happening.
Easily exportable, or integrated into your own system through the API. Nothing is left in a phone gallery or a glovebox.
What was done, when it was done and how it was done. Visible to the project manager and the network owner without a phone call.
Cabinets, customer drop-offs and customer end points. Marker balls, connection points and any other point of interest. 3D position and photo evidence recorded together at the point.
Walk through the installation techniques field teams actually use and see how Groundhawk captures accurate as-built data at each stage, regardless of construction method.
No separate surveying visit to schedule, wait for or pay for. The mapping cost comes out of the work that is already happening.
Easily exportable, or integrated into your own system through the API. Nothing is left in a phone gallery or a glovebox.
What was done, when it was done and how it was done. Visible to the project manager and the network owner without a phone call.
Groundhawk is designed for the crew already on site, and a short training is enough. Start small with a pilot project on one worksite.
Book a online demo session with us and you'll discover how leading contractors across the Europe are transforming their approach to surveying and documentation using real-time 3D scanning technology – saving time, cutting costs, and protecting underground assets.